Controlled rigging and installation of large-diameter piping for a critical public-infrastructure upgrade.
How the project came together.
URE handled large-diameter pipe components and supported their installation within the water-infrastructure project.
Pipe geometry, lifting points, site access, adjacent systems and receiving connections shaped the handling method and placement sequence.
The rigging plan was coordinated with the mechanical scope so each component could move safely into its installed position.