Machinery moving · precision placement

Rigging & machinery moving

Industrial rigging, machinery moving and precision placement for heavy, sensitive and technically demanding equipment.

URE has moved and set industrial machinery since 1966. Its crews plan around equipment weight, access, travel path, foundations, operating conditions and final alignment. They bring the labor, lifting systems and field coordination required to complete difficult moves safely and efficiently.

Common project scopes

  • Heavy machinery moves
  • Plant relocations
  • Production equipment
  • Electrical equipment
  • Medical equipment
  • Restricted-access lifts

Machinery moving and relocation

Planning and field execution for equipment moves within a facility or between sites.

  • Heavy machinery moving
  • Plant relocations and equipment removal
  • Production-line moves and reconfiguration

Rigging and precision placement

Controlled handling from the pickup point through final setting and alignment.

  • Precision equipment placement
  • Presses, conveyors and production machinery
  • Final positioning and alignment support

Electrical and medical equipment

Rigging methods planned around sensitive, high-value and technically demanding equipment.

  • Generators, transformers and switchgear
  • MRI and X-ray equipment
  • Sensitive electrical and medical systems

Restricted-access work

Equipment movement where clearances, operating conditions or the set location limit conventional access.

  • Indoor and rooftop rigging
  • Restricted-access machinery moves
  • Lift planning around active facilities
Large-diameter pipe being rigged for a Los Angeles water infrastructure project

Related rigging project

LA Water District pipe rigging

Controlled rigging and installation of large-diameter piping for a critical public-infrastructure upgrade.

Sector
Utilities and public works
Location
Los Angeles, California
Scope
Industrial pipe rigging and mechanical support
View project

Southern California rigging service area

Industrial rigging across the Los Angeles region and Southern California.

URE plans machinery moves, crane lifts and precision equipment placement throughout Los Angeles County, Orange County and the Inland Empire, with project coverage across Southern California. Crews review weight, access, travel paths, floor capacity and final setting requirements for each site before mobilization.

Explore service areas

Planning and execution

The route and set point determine the rigging plan.

URE reviews the equipment, travel path, lifting points, floor and foundation capacity, overhead clearances and final position before selecting the rigging method.

Document the equipment and route

Confirm weight, dimensions, center of gravity, pickup and set points, travel surfaces, clearances and site access.

Select the method and equipment

Match cranes, forklifts, gantries, trailers and rigging systems to the load, site conditions and required sequence.

Control movement through final placement

Coordinate exclusion areas, communications, equipment movement, setting and alignment with the project and facility teams.

Project fit

Questions before work begins.

What information does URE need to plan a machinery move?

Equipment weight and dimensions, pickup and set locations, access conditions, available drawings, schedule and final placement requirements provide the starting point.

Can URE work inside active or restricted facilities?

Yes. URE plans rigging around access, operating restrictions, occupied areas, shutdown windows and the controls required by each site.

Can URE coordinate transportation and equipment installation?

Yes. Heavy hauling, offloading, rigging, foundations and equipment setting can be coordinated under one project sequence when the scope requires them.

Start a conversation

When the scope gets complicated, start with URE.

Start a conversation →