Production · utilities · mechanical systems

Process & mechanical piping

Process, utility and mechanical piping for equipment installations, facility modifications and plant operations.

URE’s process-piping crews support individual equipment connections, production systems and turnkey plant installations. Work is planned around the process, facility and operating schedule so piping, equipment and construction scopes stay coordinated.

Common project scopes

  • Equipment connections
  • Production systems
  • Utility piping
  • Facility modifications
  • Plant installations
  • Shutdown tie-ins

Process and utility piping

Piping that supports production equipment, facility utilities and operating systems.

  • Process and utility piping
  • Equipment-process connections
  • Plant piping installations

Mechanical and welded systems

Fabricated and installed piping planned around material, pressure and system requirements.

  • Mechanical piping
  • Stainless-steel and welded piping
  • Fabricated piping assemblies

Pneumatic and hydraulic systems

Distribution and equipment connections for air, hydraulic and related production systems.

  • Compressed-air systems
  • Pneumatic piping
  • Hydraulic piping and conveyor systems

Tie-ins and facility modifications

New piping integrated with existing equipment, utilities and operating schedules.

  • Equipment tie-ins
  • Facility piping modifications
  • Shutdown and phased installation work
Temporary chilled-water piping being handled for the Los Angeles VA Hospital

Related piping project

VA Hospital temporary chiller piping

Temporary chilled-water piping installed to maintain cooling during scheduled equipment upgrades at the VA Hospital.

Sector
Healthcare
Location
Los Angeles, California
Scope
Temporary chilled-water piping
View project

Southern California piping service area

Process and mechanical piping for Southern California facilities.

URE supports equipment connections, utility piping, production systems and facility modifications across Los Angeles County, Orange County, Riverside County and San Bernardino County, with project coverage throughout Southern California. Tie-ins, testing and shutdown requirements are planned around each facility.

Explore service areas

Planning and execution

Every connection has to fit the system and the schedule.

URE reviews process requirements, pipe materials, connection points, equipment interfaces, testing and shutdown windows before fabrication and installation begin.

Define system requirements

Confirm service, material, pressure, flow, connection details, supports and applicable testing or inspection requirements.

Coordinate fabrication and tie-ins

Plan field measurements, prefabrication, equipment connections, utility isolation and shutdown windows around site operations.

Install, test and document

Sequence installation, welding, supports, testing and turnover so the completed system is ready for the next project phase.

Project fit

Questions before work begins.

What is the difference between plumbing and process piping?

Building plumbing serves fixtures, water, sewer, gas and facility utilities. Process piping supports production, mechanical and equipment systems with materials and connections selected for the service.

Can URE connect new equipment to existing piping systems?

Yes. URE can field-verify connection points, plan shutdowns and install the piping needed to integrate new or replacement equipment.

Can process piping be coordinated with equipment installation?

Yes. URE can coordinate equipment setting, structural supports, mechanical piping and utility connections under one field sequence.

Start a conversation

When the scope gets complicated, start with URE.

Start a conversation →