Equipment installation

Receiving, moving, setting and assembling industrial and medical equipment, from individual machines to complete production systems.

URE supports equipment installation from delivery through final placement. Its experience includes electrical, medical, manufacturing and recycling equipment in active plants, healthcare facilities, construction sites and other high-profile locations.

Common project scopes

  • Production machinery
  • Electrical equipment
  • Medical equipment
  • Replacement equipment
  • Complete systems
  • Restricted-access installations

Receiving and offloading

Equipment handling begins with delivery access, inspection and a controlled path into the site.

  • Equipment receiving and inspection
  • Offloading and staging
  • Internal movement

Industrial equipment installation

Setting and assembly for individual machines and complete production systems.

  • Presses and production machinery
  • Conveyors and production lines
  • Manufacturing and recycling equipment

Electrical and medical equipment

Installation planning for sensitive equipment and technically controlled facilities.

  • Switchgear, transformers and generators
  • MRI and X-ray equipment
  • Other specialized medical equipment

Setting, support and alignment

Final placement coordinated with foundations, anchorage, seismic support and equipment connections.

  • Mechanical setting and assembly
  • Foundations and anchorage
  • Alignment and seismic support
Replacement solar inverter installed on an equipment platform in Calexico

Related equipment-installation project

Calexico solar inverters

A four-phase inverter replacement program combining equipment removal, platform modification and installation across a five-square-mile solar site.

Sector
Energy infrastructure
Location
Calexico, California
Scope
Rigging, equipment installation, structural steel
View project

Southern California installation service area

Equipment installation across the Los Angeles region and Southern California.

URE receives, moves, sets and assembles industrial, medical and technical equipment throughout Los Angeles County, Orange County and the Inland Empire, with project coverage across Southern California. Delivery, access, foundations, utilities and final alignment are reviewed together.

Explore service areas

Planning and execution

Installation starts before the equipment arrives.

URE reviews delivery access, equipment dimensions and weight, receiving, travel path, foundation readiness, anchorage, utilities and final alignment as one installation sequence.

Confirm delivery and site readiness

Review equipment information, delivery timing, offloading area, travel path, foundation, anchors, clearances and connection requirements.

Plan movement and setting

Select the rigging and handling method, coordinate access controls and sequence assembly or placement with surrounding work.

Set, align and turn over

Complete final placement, assembly, anchorage and alignment so the equipment is ready for connections and commissioning by the responsible teams.

Project fit

Questions before work begins.

What equipment can URE install?

URE installs production machinery, presses, conveyors, electrical equipment, medical equipment and complete systems based on the project's technical and site requirements.

Can URE receive and offload equipment?

Yes. Receiving, inspection, offloading, staging, internal movement and final setting can be included in the installation scope.

Can URE coordinate foundations and utility connections?

Yes. URE can coordinate foundations, structural supports, plumbing, process piping and equipment placement when those scopes need one field sequence.