One Wilshire Project Electrical Equipment Rigging

Offload, storage, re-load, transport, rigging, and setting of electrical equipment at One Wilshire in Los Angeles, CA.

United Riggers & Erectors, Inc. was contracted to receive, store, transport, and install electrical equipment.

How the project came together.

Generator, Power Distribution Center (PDC), Transformers, Switchgear, Automatic Transfer Switch (ATS), Power Distribution Unit (PDU), Automatic Transfer Switch (ATS), Load Interrupter Switch (LI Switch), Concrete Electrical Vault.

Street Closure Permits, Oversize Load Permits, Traffic Control, Critical Lift Plan, Crane Pick Plan

Rigging was performed using hydraulic cranes, rigging equipment per pick plan, hydraulic jacks, dollies, forklifts, telehandlers, and Versa-Lift. All field personnel hold qualified rigger certification and OSHA-10 certification, and all field supervision hold OSHA-30 certification.